MIDC's rules on what an industrial plot costs are set out in a short circular. It is titled "MIDC Pricing Policy" (महाराष्ट्र औद्योगिक विकास महामंडळाचे (एमआयडीसी) भूखंड वाटपाच्या दराबाबतचे धोरण) and dated 16 October 2025. It works together with MIDC's allotment policy, MILAAP 1.0, which says that rates under MILAAP follow this Pricing Policy. The circular states that it applies from 3 September 2025.
This guide explains the rate-setting logic as the circular prints it. It then explains how to read MIDC's published land-rate page for the Pune and Satara industrial areas. "The circular says" means the text of the circular. "Practical tip" means our own suggestion.
01What the policy is for
The circular records that the proposal was placed before MIDC's Board at its 407th meeting on 12.09.2025 and passed as resolution no. 7033. It states the aim as:
- giving entrepreneurs transparent and fair access to industrial plots through a value- or rate-controlled bidding process;
- encouraging industry with reasonable rates, without aiming at profit for MIDC.
The circular says the MIDC Disposal of Land Regulations, 1975 allow MIDC to allot plots by public auction or by entertaining individual applications. Under the new policy, applications are accepted only through MIDC's online portal, which is to display all vacant plots on a continuing basis.
02The building blocks: three rates and a band
1. Prevailing rate (प्रचलित दर)
The circular says the allotment rate for industrial plots is fixed under MIDC circular no. A69008 dated 21.02.2019. Under that method, MIDC calculates the rate to recover the actual expenditure it has incurred, not to make a profit. The prevailing rate is the rate fixed or revised by MIDC from time to time. Where they apply, road-width charges are added.
2. Upset rate (आधारभूत दर)
The upset rate is the prevailing rate plus 10% of the prevailing rate. It is the minimum: no bid may be below it.
3. Cap rate (उच्चतम दर / कॅप रेट)
The cap rate is the maximum bid allowed for each industrial area. Appendix A of the circular sets it as a percentage above the upset rate:
| Industrial areas (Appendix A) | Cap rate above the upset rate |
|---|---|
| Areas under the metropolitan authorities (Mumbai, Pune, Nashik), within municipal corporations, and all areas in zones (प्रभाग) A and B | 50% |
| All areas in zones C, D and D+ | 25% |
4. The rate band (दर कक्षा)
The band runs from the upset rate (the minimum) to the cap rate (the maximum). The circular says an applicant must quote a rate within the band; a rate outside it cannot be entered. Bids are encrypted to keep them confidential and prevent tampering.
Our arithmetic, not printed in the circular: the cap is a percentage of the upset rate, and the upset rate is 110% of the prevailing rate. So a 50% cap works out to 165% of the prevailing rate, and a 25% cap to 137.5% of it, before any rounding.
Rounding
- Where the upset or cap rate works out to a fraction, it is rounded up to the next whole number.
- Rates after the annual increase are rounded up to the next ten.
03The 9% annual increase
The circular says that, after the circular is issued, a 9% increase applies from 1 April every year to the rates fixed by MIDC. The Chief Executive Officer (CEO) may raise rates by more than 9% in some industrial areas.
The circular explains why rates differ by region. MIDC has industrial areas down to taluka level, including in North Maharashtra, Marathwada and Vidarbha. Demand is weak in less-developed areas and land values vary across the state. One method for the whole state would therefore not be appropriate, so different bands are needed in different areas.
04Which rate applies to which route
The circular links rates to the allotment method:
| Allotment method | Rate rule in the circular |
|---|---|
| Industrial plots without tender (विना निविदा): mega and ultra-mega projects, important government projects, companies with an MoU with the Industries Department, and reserved MSME plots | At the upset rate |
| Industrial plots by cap tender | Within the band, from the upset rate up to the cap |
| Commercial and residential plots, and industrial galas, by open tender | Upset rate only; no cap |
The MILAAP circular adds one case: land-locked land allotted directly to an adjoining plot holder is priced at 150% of the upset rate.
05How the winning rate is decided
- 1One eligible applicant: after technical scrutiny, if the LAC decides to allot, the plot goes at the rate the applicant quoted within the band.
- 2More than one eligible applicant: the eligible applicants' rates are opened. The plot goes to whoever quoted the highest rate within the band.
- 3A tie at the highest rate: the tied applicants present their detailed project reports (DPRs) to the Land Allotment Committee (भू-वाटप समिती). The committee considers investment, new technology, innovation, employment potential, environmental sustainability and fit with state industrial policy. The circular says its decision binds all applicants.
06When the CEO can change a band
The circular gives the CEO these powers:
- to change an area's band, and the cap within it, based on demand in that area or the potential of a particular plot, without regard to the area's zone category;
- if a plot has been on the MILAAP portal for six months with no demand, to reduce its band with the approval of MIDC's Board;
- if there is still no response, to revise the band again, also with Board approval.
Proposals to reduce a band go from the Regional Officer through the Deputy CEO and Joint CEO, with reasons. The circular also says MIDC's prevailing transfer policy continues to apply to plot holders.
07Reading MIDC's land-rate page for Pune and Satara
MIDC publishes area-wise rates on its Land Rates page, linked from the MIDC website's Investors menu. You choose a district and the page shows a table.
What the table contains
Each row has six columns:
- District
- Regional Office
- Industrial Area
- Industrial Rate
- Residential Rate
- Commercial Rate
Some cells read "NA", meaning no figure is published for that use in that area. As captured on 14 November 2026, the rows for the main industrial belts around Pune and Satara are:
| District | Regional Office | Industrial areas listed |
|---|---|---|
| Pune | RO PUNE-I | Chakan Ph-1, Ph-2, Ph-3, Ph-4 and Ph-5; Talegaon; Talegaon Ph-2, Ph-4 and Ph-5 |
| Pune | RO PUNE-II | Ranjangaon; Ranjangaon Ph-3 |
| Satara | RO Satara | Satara; Addl. Satara; Khandala Ph-1; Khandala Ph-2; Kesurdi (Khandala) (SEZ) |
The Pune list also includes areas under RO Baramati and IT parks under RO PUNE-II. Ranjangaon appears a second time, under a "RO PUNE-II (IT)" label. The Satara list also includes areas such as Karad, Lonand, Wai and Phaltan. There is no MIDC area named Shirwal; the nearest listed areas are Khandala Ph-1, Ph-2 and Kesurdi (Khandala) (SEZ).
What the page does not tell you
- No effective date. The page does not say from when its figures apply. Because the policy adds 9% every 1 April, you cannot tell from the page whether a figure includes the latest increase.
- No unit. The column headings say only "Industrial Rate", "Residential Rate" and "Commercial Rate". No currency or area unit is shown.
- No label against the policy's terms. The page does not say whether its figures are the prevailing rate, the upset rate or something else. It also does not show road-width charges or the cap rate.
For these reasons we do not reproduce the figures here.
Practical tip: before you budget or bid, write to the Regional Office for the area and ask for four things in writing:
- the prevailing rate in force on your expected application date, and its unit;
- whether road-width charges apply to your plot;
- the area's zone, or whether it falls under the 50% or 25% cap;
- the upset rate and cap rate for the specific plot on MILAAP.
Then check that the band shown on the portal matches.