The Maharashtra Industrial Development Corporation (MIDC) has replaced its separate rules for direct allotment, e-bidding and priority allotment with one consolidated policy. It is called the MIDC Industrial Land Application and Allocation Policy, MILAAP 1.0 (एमआयडीसी औद्योगिक भूखंड मागणी अर्ज व वाटप धोरण). It was issued as an MIDC circular (परिपत्रक) dated 17 October 2025 and states that it applies from 3 September 2025.
This guide explains what the circular says about applying for a plot in MIDC areas such as Chakan, Talegaon, Ranjangaon, Khandala or Satara. "The circular says" means the text of the circular. "Practical tip" means our own suggestion, which goes beyond the circular's words. The circular is in Marathi; where a term matters, the Marathi is given once in brackets.
01Why MIDC issued MILAAP
Under the MIDC Disposal of Land Regulations, 1975, land is allotted by public auction or e-bidding, or by entertaining individual applications. MIDC had issued many separate circulars on these routes. MILAAP consolidates them, citing ease of doing business and transparency. The circular records Board resolutions at the 407th meeting (12.09.2025) and the 408th meeting (06.10.2025).
02The three allotment routes
The circular sets out three routes. Each has its own Land Allotment Committee (भू-वाटप समिती, "LAC"), shown on the circular's flow chart.
| Route | What it covers | LAC shown |
|---|---|---|
| A. Direct allotment without bidding (विना-निविदा) | Industrial plots for important and government projects | LAC (CEO) |
| B. Allotment by cap e-bidding (कॅप ई-निविदा) | Industrial plots, for categories decided by the CEO | LAC (Jt CEO) |
| C. Open e-bidding (खुली ई-निविदा) | Commercial and residential plots and galas, and industrial galas and sheds | LAC (Jt CEO / Dy CEO / RO) |
The circular says that if the same industrial plot receives applications under both route A and route B, the route A application gets priority. The other applicants' application and processing fees are refunded online.
03Who can apply: categories by route
The circular does not have one general eligibility rule. Instead, each route lists categories of applicant.
Route A: direct allotment
The categories listed are:
- 1Mega and ultra-mega projects approved by the Maharashtra government.
- 2Public sector undertakings of Maharashtra, the Centre and other states.
- 3Companies that have signed an MoU with the state Industries Department.
- 4A plot holder or applicant seeking land-locked land that cannot be allotted to anyone else. The circular says the rate is 150% of the upset rate. If more than one adjacent plot holder asks for it, a close bid is held among them.
- 5Allotment at concessional rates for amenities, under earlier circulars.
- 6Expansion by an existing plot holder onto an adjacent plot, or a plot in the same industrial area. The conditions include:
- an area of at most two to two-and-a-half times the original plot, shed or gala;
- the existing unit running at full capacity;
- the same or an allied line of products;
- no part of the original plot sub-let;
- a no-dues certificate.
- 7Plots reserved for micro, small and medium enterprises (MSME), up to 2,500 sq m. Applicants must file a detailed project report (DPR), Udyam registration, a Maharashtra domicile certificate and, where relevant, certificates such as caste validity. If more than one applicant is eligible for a plot, an online close bid is held.
- 8Government-approved industrial clusters under MSE-CDP or MSICDP. The circular sets a minimum of 20 members and at most 200 sq m per member.
For expansion (item 6), the circular also requires a minimum use of the original plot's floor space index (चटई निर्देशांक, FSI), backed by an occupancy certificate or building completion certificate (OC/BCC). The minimum is at least 60% in the Mumbai and Pune metropolitan regions and other municipal corporation areas, and at least 40% elsewhere. It also sets minimum investments, excluding working capital. These range from Rs 0.5 crore to Rs 20 crore, depending on the zone (प्रभाग) and the plot size band.
Route B: cap e-bidding
The categories listed are:
- 1Companies bringing foreign direct investment (FDI).
- 2Expansion into a different MIDC industrial area.
- 3Companies manufacturing in other states.
- 4Vendors of mega and ultra-mega anchor units.
- 5Electric vehicles, ACC batteries, EV parts and recycling.
- 6Thrust sectors under the Industrial Policy 2019. This list includes logistics activities as described in the Maharashtra Logistics Policy 2024.
- 7Defence suppliers.
- 8Fortune Global and Economic Times listed companies.
- 9Investment-based applicants for plots of 2,500 sq m and above.
- 10Investment-based applicants for plots below 2,500 sq m.
Each category has a minimum fixed capital investment (FCI) by zone. For plots below 2,500 sq m, the circular prints two tables. Table 10A applies up to 19.10.2025. Table 10B applies from 20.10.2025 onwards. Under 10B, the minimum FCI ranges from Rs 0.4 crore for plots up to 500 sq m in zones D and D+, to Rs 5 crore for plots up to 2,500 sq m in zone A.
For FDI companies, the circular ties the FDI brought in to project stages. It must at least equal the premium before allotment, and reach 25% of the proposed FDI before plan approval, 75% before BCC/OC and 90% before production. A shortfall attracts a penalty of 10% of the prevailing rate per year.
Practical tip: the circular uses zones A, B, C, D and D+ throughout, but it does not say which industrial areas fall in which zone. Before you plan around an investment threshold, confirm your target area's zone with the MIDC Regional Office.
Route C: open e-bidding
The circular says all commercial and residential plots and galas, and all industrial galas, sheds and plug-and-play units, go through open e-bidding. One exception is residential plots reserved for MIDC staff. Residential plots are open only to registered or proposed housing societies.
04How to apply
The circular says every application under routes A, B and C must be made online on the MIDC Industrial Land Application and Allocation Portal (MILAAP), through MIDC's website (printed as www.midcindia.org). The portal runs 24x7. It handles the following steps:
- 1application and fee payment;
- 2acknowledgement and technical scrutiny;
- 3comments from the technical adviser, environment and other departments;
- 4the LAC agenda and minutes;
- 5the e-offer letter, e-allotment order or e-comfort letter.
Fees and earnest money
The application and processing fee, plus GST, depends on the area demanded:
| Area demanded | Fee (Rs) + GST |
|---|---|
| Up to 10,000 sq m | 10,000 |
| 10,001 to 20,000 sq m | 20,000 |
| 20,001 to 40,000 sq m | 40,000 |
| 40,001 sq m and above | 50,000 |
For routes B and C, the applicant must deposit earnest money (इसारा रक्कम, EMD) of 5% of the plot price at the upset rate online with the application. Once the eligible highest bidder is decided, the other applicants' EMD is refunded online. For route B, the circular excludes MSME reserved plots from this EMD rule.
Documents
Appendix 1 of the circular lists what the DPR must contain. Its 21 numbered headings include:
- promoter profile and constitution;
- registrations;
- products and capacities, and raw materials;
- project cost, broken down into land, building, plant and machinery, power and utilities;
- means of finance, with a net worth certificate from a CA;
- implementation schedule and financial analysis;
- energy sources;
- pollution control: process flow, ETP and STP, water budget and an environment management plan;
- employment.
It says all the documents are mandatory and must be signed by the applicant or an authorised person. Part B lists 15 environmental details to file with the e-application. Part C is a checklist for expansion applications, including audited accounts for the last three years and an MPCB consent to operate.
05Timelines in the circular
Route B (cap e-bidding)
- The LAC meets every Monday, or the next working day.
- All applications for a plot go to the first scheduled LAC held after five office days from the first application.
- If a new application for the same plot arrives before that meeting, all the applications move to the next scheduled LAC. The same can happen once more, to a third LAC.
- After the second scheduled LAC, applications for that plot are accepted only until 5.00 pm on the following Wednesday. Acceptance then closes.
- Technical scrutiny must be finished before the scheduled LAC. Applicants are told of any rescheduling by email or SMS.
Route C (open e-bidding)
- If a plot or gala gets fewer than three applications in the first seven days, or fewer than three are eligible, the window is extended by seven days. If that happens again, it is extended by seven more days.
- After the second extension, all applications go to the LAC, however many there are.
06How the winner is decided
For route B, the LAC opens the financial envelope. If only one applicant is eligible, the plot goes at the rate that applicant quoted within the rate band. If several are eligible, it goes to the highest rate. A bid may not be below the upset rate.
If there is a tie, the tied applicants present their DPRs to a further LAC. The LAC weighs investment, new technology, innovation, employment, environmental sustainability and fit with state industrial policy. The circular says the LAC's decision binds all applicants. For route C, a tie leads to a close bid, which starts from the tied highest rate.
07After allotment
The circular itself says little here. It states that:
- the offer letter (देकारपत्र) and allotment letter (वाटपपत्र) follow online once the LAC minutes are approved;
- MIDC's prevailing policies continue to govern the development period, minimum FSI use and extensions of time;
- plots surrendered, or taken back for not being developed in time, go straight back onto the vacant plot list.
Practical tip: because the development period and extension rules sit in other MIDC policies, ask for them in writing before you bid. Do this alongside the draft lease terms.
08Applications made under the old circulars
The circular cancels or supersedes (रद्द/अधिक्रमित) the earlier circulars listed in its Appendix 2, from the policy date. It also cancels all applications still pending under them and refunds their processing fees. It also refunds the processing fees of MILAAP applications rejected between the portal's launch and the date of the circular.
Practical tip: if you had an application pending under an older MIDC route, check its status with the Regional Office.
09Source
- MIDC circular जा.क्र.मऔविम/भू-विभाग/म.व्य.(भूमी)/P२२१३०९ dated 17/10/2025, MIDC Industrial Land Application and Allocation Policy, MILAAP 1.0, signed by the Chief Executive Officer: official PDF.
- Rates under MILAAP follow MIDC's separate Pricing Policy, which we explain in our companion guide on MIDC allotment rates.