MIDC publishes its industrial plot inventory on the MIDC Land Bank. Each plot row carries a reservation tag, an upset rate and a remark such as "Infrastructure in Process" or "Land not in Possession". The page has no legend that explains these labels.
This guide explains what each column and label means, using MIDC's own circulars where they define a term. We read the Land Bank rows for Chakan, Talegaon, Ranjangaon, Kesurdi (Khandala) and Satara, captured on 15 and 16 November 2026. Where a label is not defined in any MIDC circular we hold, we say so and give a cautious "our reading". Treat that as a question to put to the MIDC Regional Office, not as an answer.
This is not a guide to the application process. For routes, fees and timelines, see How MIDC plots are allotted.
01How the Land Bank page is laid out
The page has two kinds of table.
- An area summary. The columns are "Regional Office", "Industrial Area", "Total Plots Available" and "Current Rate (Rs/sq meter)". This is one row per industrial area or phase, such as "RO PUNE-II | Ranjangaon Ph-3 | 203 | 5370".
- A plot list for each area. The columns are "Plot", "Upset Rate", "GIS", "MSME Reservation", "Remarks" and "Action". Areas with nothing listed show "No Records!!!".
There are two sets of these tables. One lists vacant plots. The other lists plots whose allotment is already under way. In every plots-under-allotment row we saw, the remark ends in "Allotment in progress". In the Chakan and Talegaon captures, the Action column on those rows reads "Allotment Under Process", and vacant Talegaon rows show "Apply".
A count of zero is common. On 15 November 2026 the summary showed 0 plots available in all five Chakan phases. Only Talegaon Ph-4 (2) and Ph-5 (4) showed vacant plots among the Talegaon areas.
02What MIDC's circulars say about MSME reserved plots
The MILAAP 1.0 circular (17 October 2025) includes MSME reserved plots (सूक्ष्म, लघु व मध्यम उद्योगांना राखीव भूखंड) among the categories for direct allotment. As printed:
- Size. For every zone (A; B and C; D and D+), the table reads: "MSME reserved plots up to 2,500 sq m as per the Corporation's policy".
- Documents. The application must include a DPR, Udyam registration and a Maharashtra domicile certificate. Where the reservation requires it, it must also include a caste validity certificate, a disability certificate, an ex-serviceman certificate and so on.
- Several eligible applicants. If more than one applicant is eligible for the same plot, MIDC holds an online close bid. The plot goes to the applicant offering the highest rate.
The circular also says the Pricing Policy's rate band and the 5% earnest money rule for cap e-bidding do not apply to MSME reserved plots.
The Pricing Policy (16 October 2025) says MIDC keeps some industrial plots reserved for MSMEs, in line with important government projects and state policy. Reserved MSME plots are allotted at the upset rate.
What the circulars do not print. Neither circular gives:
- a percentage of plots reserved for MSMEs, SC/ST applicants, women, ex-servicemen or persons with disabilities (but see the 2016 circular below);
- the list of reservation sub-categories.
MILAAP refers to "the Corporation's policy" for this. An earlier MIDC circular, D77638 of 16 November 2016, reserves 20% of the area for micro and small units, as plots of up to 200, 500, 1,000 and 2,500 sq m, with a share for SC/ST applicants within it. MILAAP does not list D77638 among the circulars it cancels, but it does not say how the two fit together either, so confirm the current position with the Regional Office. The details are in our guide to MSME plots in MIDC areas.
Can an MSME get a reserved plot? On the circulars' own words, yes. MSME reserved plots of up to 2,500 sq m exist as a direct-allotment category, subject to the documents above and a close bid among eligible applicants. Whether a particular row is open to you depends on its tag and on MIDC's reservation policy, so confirm with the Regional Office.
The circular also has a separate category for government-approved industrial clusters under MSE-CDP or MSICDP. These need at least 20 members, with at most 200 sq m per member.
03What the upset rate is
The Pricing Policy defines the upset rate (आधारभूत दर) as the prevailing rate fixed by MIDC plus 10% of that prevailing rate. It also defines the prevailing rate as the rate MIDC fixes or revises from time to time, plus road-width charges where they apply. The upset rate is the minimum of the rate band: no bid may be lower.
On the Land Bank, the upset rate on a plot row often works out to 110% of the area's "Current Rate". That is our arithmetic, for example 5,780 × 1.1 = 6,358 in Chakan and 5,370 × 1.1 = 5,907 in Ranjangaon Ph-3. Some rows differ. In Kesurdi (Khandala) SEZ, for example, the current rate is 3,940 but the plot upset rates are 4,768 and 4,551. The Land Bank does not explain the difference, and plot rows print no unit.
For the cap rate, bidding band and annual increase, see How MIDC sets plot rates.
04Column-by-column reference
| Land Bank column / value | What it means (source or "our reading") | Pinpoint |
|---|---|---|
| Total Plots Available | Count of vacant plots for that area, as published. The Pricing Policy says all vacant plots will be shown on MIDC's online portal, and applicants can view the vacant plot list 24x7. | Land Bank summary; Pricing Policy p.2 (first bullet, §2.2) |
| Current Rate (Rs/sq meter) | MIDC does not label it against the Pricing Policy's terms. Our reading: the area's base rate, not the plot's bid floor. | Land Bank summary |
| Upset Rate | Prevailing rate plus 10% of it; the minimum bid. | Pricing Policy p.2 §1.1, §1.2, §1.4 |
| GIS: Mapped / Not mapped / See in GIS | Not defined. Our reading: whether the plot is plotted on MIDC's GIS map. | Land Bank plot lists |
| MSME Reservation: General · Gen-General | Not defined. Our reading: not tagged for a specific social category. Whether a "General" row is also MSME-reserved is not stated. | Land Bank plot lists |
| SC/ST · SC/ST-General; Gen- or SC/ST- with Women or SelfHelp Group of Women, Ex-Serviceman, Specially abled | Sub-categories are not defined in our sources. MILAAP asks for caste validity, disability and ex-serviceman certificates "as per reservation, if applicable". | MILAAP p.7, item 7.1 |
| Government Approved MSME Cluster | Not defined under this label. MILAAP has a category for clusters approved under MSE-CDP or MSICDP. Our reading: likely linked, so confirm. | MILAAP p.8, item 8 |
| Infrastructure in Process | Not defined. Our reading: MIDC's infrastructure works for the plot are not yet complete. | Land Bank (Ranjangaon Ph-3) |
| Infrastructure not available / INFRASTRUCTURE IS NOT AVAILABLE | Not defined. Our reading: infrastructure is not yet in place at the plot. | Talegaon capture p.1–2 |
| Land not in Possession | Not defined. Our reading: MIDC may not yet hold physical possession of the land. | Land Bank (Ranjangaon Ph-3) |
| Reserved for IFB | Not defined; the abbreviation is not expanded. | Land Bank (one Ranjangaon Ph-3 row) |
| N.A. | Not defined. Our reading: no remark recorded. | Land Bank plot lists |
| Allotment in progress / Allotment Under Process | Not defined. Our reading: an allotment is under way, so the plot is not open. | Land Bank under-allotment lists |
05What we counted
These counts come from the captures. They are our own counts, not MIDC's figures.
- Ranjangaon Ph-3 (vacant list, 203 rows, matching its summary):
- Remarks. 155 read "Infrastructure in Process", including one misspelt and one with "and Reserved for IFB". 48 read "Land not in Possession", including case and spelling variants.
- MSME Reservation tags. 173 rows carry a General tag: 72 "General", 85 "Gen-General", 8 "Gen-Women or SelfHelp Group of Women", 5 "Gen-Ex-Serviceman" and 3 "Gen-Specially abled". 30 rows carry an SC/ST tag: 27 "SC/ST-General", and one each of Ex-Serviceman, Women or SelfHelp Group of Women, and Specially abled.
- Kesurdi (Khandala) SEZ: 7 vacant rows, all "General", remark "N.A.".
- Talegaon Ph-2: 10 under-allotment rows, of which 7 are tagged "Government Approved MSME Cluster".
- Talegaon Ph-5: 4 vacant rows. One is tagged "Gen-Specially abled" and three "SC/ST-General".
Some under-allotment remarks also carry site notes, such as "Electric line" and "Farmer Distpute and School Encroachment" (spelling as published) in Ranjangaon. These are worth reading before you shortlist a plot. For the area itself, see our guide to Ranjangaon MIDC.
06How to read a plot row
- 1Start with the area summary. If "Total Plots Available" is 0, the vacant list for that area will show "No Records!!!".
- 2Check which list the row is in. A row with "Allotment in progress" or "Allotment Under Process" is not open.
- 3Read the plot number and area. The area is printed with the plot number, for example "C-14 2148 sq.m". Compare it with the 2,500 sq m ceiling for MSME reserved plots.
- 4Read the MSME Reservation tag. Note both parts:
- the category, such as General or SC/ST;
- the sub-category, such as Women, Ex-Serviceman or Specially abled.
- 5Check you hold the documents. If the tag is a reserved one, check that you hold the certificate MILAAP asks for, then confirm your eligibility with the Regional Office.
- 6Read the remark literally. "Infrastructure in Process", "Land not in Possession" and "Infrastructure not available" are not explained by MIDC in our sources. Ask the Regional Office, in writing, what each means for possession and services, and by when.
- 7Note the upset rate and compare it with the area's current rate. If it is not 110% of the current rate, ask why.
- 8Open the GIS view. Check the plot's location and access before you apply.
- 9Re-check on the day. Rows and counts change. Take a dated screenshot of the row you rely on.
MSME reserved plots up to 2,500 sq m as per the Corporation's policy.
That line, from the MILAAP table (our translation), is as far as the circulars we hold go on reservation. The detail sits in a policy we have not yet seen. Until it is checked, read every reservation tag as a prompt to ask MIDC, not as a confirmed entitlement.