Is MIDC land kept aside for micro and small units? What plot size can they get, and does MIDC give them priority? MIDC has dealt with these questions in a series of circulars (परिपत्रक) since 2016. This guide sets them out in date order and reports only what each one prints, with page references. Where a circular does not say how it relates to another, we say so rather than guess.
For the reservation tags on MIDC's plot inventory, see Reading MIDC's Land Bank. For the application portal, fees and bidding routes, see How MIDC plots are allotted.
01Two different things: reservation and cluster priority
- Reserved plots. A share of plot area kept for micro and small units (the 2016 circular), and "MSME reserved plots" as a direct-allotment category (MILAAP 1.0, 2025).
- Priority allotment to clusters. Plots allotted on priority to a group of micro and small entrepreneurs (सूक्ष्म व लघु उद्योजकांचा सामूहिक गट), not to a single unit (the 2019, 2021 and 2026 circulars and MILAAP item 8).
None of the circulars we hold prints a priority rule for a single unit applying on its own. For a single unit, the printed route is the reserved-plot category.
02The circulars in date order
| Circular | Date | What it says (as printed) | Pinpoint |
|---|---|---|---|
| D77638 | 16.11.2016 | In new industrial area layouts, 20% of the area under industrial plots is to be reserved for micro and small industries, as plots of up to 200, 500, 1,000 and 2,500 sq m. In already developed areas where plots are allotted by the direct method, 20% of the area that becomes available is to be reserved. Within this, area is reserved for SC/ST entrepreneurs under the government decision of 11.02.2016. Plots in the reserved 20% may not be amalgamated in future. | p.2, directions 1–3 |
| A55234 | 01.03.2019 | Priority allotment to groups of micro and small entrepreneurs in A and B zones. Conditions included at least 50 entrepreneurs, at least 60% of members' units operating, at most 200 sq m per member, and a group project investment of at least Rs 100 crore. | p.1, conditions 2–5; p.2, condition 15 |
| C66756 | 13.08.2019 | Amends A55234. Conditions 1 to 3 are replaced: priority goes to industrial clusters approved by the State-level committee under the Centre's MSE-CDP, and the cluster must obtain Central Government approval after getting the plot. No other condition changed. | pp.1–2, table |
| E55103 | 26.11.2021 | Cancels A55234 and C66756 and issues one consolidated 14-point policy for A and B zones. It keeps the 200 sq m per member limit and the Rs 100 crore minimum investment. A group that has a building completion certificate and is in production may transfer the plot after 5 years. | p.1; p.2, items 1–9; p.3, item 13 |
| MILAAP 1.0 (P221309) | 17.10.2025 | Lists "MSME reserved plots up to 2,500 sq m as per the Corporation's policy" for all zones (item 7). Separately lists government-approved industrial clusters under MSE-CDP or MSICDP (item 8): at most 200 sq m per member, at least 20 members, and a minimum group investment by zone. Lists E55103 among the circulars it rescinds. | p.7, item 7; p.8, item 8; p.20; p.27, Appendix 2 item 28 |
| P638000 | 18.05.2026 | For clusters approved under MSE-CDP or MSICDP: plots at a 20% concession on the prevailing rate, no 10% priority charges, internal asphalt roads built by MIDC, and no charge for the road area. Applies only to plots of up to 200 sq m. | p.1, items 1–3; p.2, items 4–6 |
All six are listed on MIDC's circulars page, which has no direct link to each document.
03What the 2016 reservation circular says
The 2016 circular is headed as a reservation of plots for micro and small entrepreneurs (सूक्ष्म व लघु उद्योजक) under Industrial Policy 2013 and the Dr Babasaheb Ambedkar Collective Incentive Scheme 2016. It records Board resolution 5590 of 30.07.2016.
On page 1 it records that Industrial Policy 2013 had directed 10% of the area in new MIDC areas to be reserved for micro and small industries. A government decision of 11.02.2016 had directed that 20% of the plots for micro, small and medium industries available with MIDC be reserved for SC/ST entrepreneurs. There were no definite guidelines on how much area to reserve in a layout. The directions on page 2 say:
- 1New industrial areas. When a new layout is prepared, 20% of the area under all industrial plots is to be reserved for micro and small industries, as plots of up to 200, 500, 1,000 and 2,500 sq m. Area within this is to be reserved for SC/ST entrepreneurs under the 11.02.2016 decision.
- 2Areas already developed. Where MIDC allots plots by the direct method (सरळ पद्धतीने), 20% of the area that becomes available for allotment is to be reserved for micro and small industries, again with the SC/ST share.
- 3No amalgamation. Plots laid out in the reserved 20% will not be allowed to be amalgamated in future.
The circular speaks of micro and small industries, not medium ones, and sets a share of area. It sets no eligibility test or selection method for individual applicants.
04Priority allotment to clusters, 2019 to 2021
The circular of 01.03.2019 records that, under the policy then in force, 200 sq m plots could not be laid out and allotted individually in A and B zones (p.1). The 2021 consolidated policy (E55103) is the last version in this series that we hold. Its main points:
- Who. Industrial clusters approved by the State-level committee under the Centre's MSE-CDP. After getting the plot, the cluster must obtain Central Government approval (item 1).
- Size. No member may be allotted more than 200 sq m (item 2).
- Investment. The group's project investment must be at least Rs 100 crore (item 3).
- Decision and timelines. The Head Office Land Allotment Committee decides (item 4); building permission within six months and a two-year development period (items 6–7).
- Transfer. After 5 years from the agreement or possession, whichever is earlier, for a group with a building completion certificate that is in production (item 9).
- C, D and D+ zones. Priority for government-approved clusters "as per the Corporation's policy dated 11.01.2019" (item 11). That 11.01.2019 policy is not among the sources we hold.
MILAAP 1.0 lists E55103 in its Appendix 2, the list of circulars rescinded or superseded from the policy's date (p.20; p.27, item 28).
05What MILAAP 1.0 keeps for MSMEs
Item 7: MSME reserved plots. For every zone, MILAAP prints "MSME reserved plots up to 2,500 sq m as per the Corporation's policy" (p.7). It does not name the policy. If more than one applicant is eligible for a plot, MIDC holds an online close bid and the highest rate wins. The documents are covered in our Land Bank guide.
Item 8: government-approved clusters. Clusters approved under MSE-CDP or under the state's MSICDP qualify (p.8). As printed:
- each member may have at most 200 sq m, and each cluster needs at least 20 members;
- the minimum group investment is Rs 100 crore in zones A and B, Rs 50 crore in zone C and Rs 20 crore in zones D and D+;
- the cluster must file a list of all members with full names and PAN;
- such clusters may also be allotted a plot for a common facility centre (CFC).
06Does MILAAP replace the 2016 reservation circular?
The relationship is not stated. D77638 is not among the 37 circulars in MILAAP's Appendix 2 (pp.27–28), and item 7 refers to "the Corporation's policy" without naming it. The 2016 circular's largest size is also 2,500 sq m, but that match does not show MILAAP means it. Check both with MIDC before relying on the 20% figure or the size bands.
07The 2026 cluster circular
The circular of 18.05.2026 records Board resolution 7755 of the 410th meeting, held on 24.03.2026. It applies to clusters approved under MSE-CDP or MSICDP. As printed:
- 1Plots are given at a 20% concession on the prevailing rate. In new areas the concession is built into the rate of the remaining allottable area; in old areas it is not (p.1, item 1).
- 2The 10% priority charges are not to be levied (item 2). The circular does not explain these charges.
- 3The scheme applies only to plots of up to 200 sq m (item 3).
- 4MIDC builds the internal asphalt roads, and no charge is levied for the area under them (p.2, item 4).
- 5If two or more 200 sq m plots are amalgamated, all the concessions are recovered with interest (item 5).
- 6New layouts prepared after the circular's date are to include plots of up to 200 sq m for MSME clusters (item 6).
It does not say whether it amends MILAAP item 8. Ask MIDC which conditions apply to your cluster.
08What an MSME applicant should check
- 1Pick your route. A single unit seeking a reserved plot (MILAAP item 7), or a group seeking a cluster plot (MILAAP item 8 and the 2026 circular)? The conditions differ.
- 2Check your category. The 2016 circular says micro and small; MILAAP item 7 says MSME. MILAAP asks for Udyam registration. Ask MIDC which classes are covered.
- 3Check the plot size. Up to 2,500 sq m for a reserved plot; 200 sq m per member for a cluster.
- 4Read the plot's reservation tag. SC/ST and other sub-category tags need the matching certificate.
- 5For a cluster, confirm its approval first. MSE-CDP or MSICDP approval, at least 20 members, the zone's minimum investment, and a member list with PAN.
- 6Confirm your area's zone. Investment floors depend on zone, and the circulars do not list which area is in which zone.
- 7Expect competition. Several eligible applicants for one reserved plot go to an online close bid.
- 8Ask about the 2016 circular in writing. Does the 20% reservation still apply after MILAAP, and what is "the Corporation's policy" in item 7?
- 9Do not plan to merge plots. The 2016 circular bars amalgamation in the reserved 20%; the 2026 circular recovers its concessions with interest if cluster plots are merged.
- 10Fit it into your wider plan. See our guide to setting up a manufacturing unit.
MILAAP's own words on reserved plots end at "as per the Corporation's policy" (our translation). Until MIDC confirms which policy that is, treat the 2016 figures as a question to ask, not a settled entitlement.